Project types

Industrial flex and small-bay.

Flex buildings look simple: a slab, tilt or metal walls, a few bays. The approvals that slow them down are usually under the ground and on the pole, not on the plan.

Why it gets complicated

Where the time and money go.

Larger footprints raise the fire flow the code requires, and many flex sites sit on rural water lines that were never sized for it. The answer can be nothing, a fire pump, an on-site tank or a smaller building, and each one changes the budget.

Tenants often want three-phase power. New transformers and line extensions have their own lead times, set by the electric provider, and they can run longer than the rest of the approvals.

Trucks need turning room and a driveway in the right place. Spacing rules on highways and county roads, plus any future road reservation on the frontage, can move the building, the dock doors or the whole layout.

Many flex sites are outside city limits, where there is no zoning but county subdivision, septic, floodplain and fire rules still apply.

What we look at first

Deal-killers first, in order.

The checks most likely to change the plan for this type of project. Each links to a plain-English guide.

Before you close

Questions to ask early.

Cheap to ask before closing. Expensive to learn after.

  • Is the tract a legal lot, or will the county or city require a plat or replat first?
  • What fire flow will the fire marshal require, and has anyone run a flow test on the nearest hydrant?
  • Who provides power, and how long is the wait for three-phase service?
  • Does the thoroughfare plan show a future road along the frontage?
  • Is there sewer, or will the building need an on-site septic system approved by the county?
  • Are there deed restrictions that limit industrial or outdoor storage uses?

Typical patterns

Common situations, and what they usually mean.

Patterns, not rules. Every report checks the actual parcel, its jurisdiction and its utilities.

SituationWhat often happensWhat we check
Sprinklered building on a small rural mainFire flow falls short; a pump or tank is addedRequired flow, available flow, pump or tank path
Tract split by deed years agoReplat needed before permitsPlat history, county compliance, road reservations
Tenant needs three-phasePower sets the opening dateProvider, equipment, lead time
Frontage on a state highwayDriveway permit and spacing limit the layoutRoad owner, speed, spacing, permit order
Land over the Edwards AquiferTCEQ plan before constructionAquifer zone, plan type, review time

Keep reading

Waitlist open · Starting in Central Texas

Check your next flex site.

Send us the parcel and the building you have in mind. We start with the deal-killers.

No spam. Sites with a live deal move up the list. Tell us about yours.