Layer 1 · Rules

Every rule that applies to your parcel.

Not a generic checklist. The specific rules for this land, from the code and the maps to the deed records, each with its source, its status and who decides.

What the rules layer reads

Twelve families of rules. One parcel.

The code

Zoning, the development code and subdivision rules, and which version applies to your parcel.

Jurisdictions

City limits, ETJ, county, utility and water districts: every body you will work through, and what each controls.

Aquifer

Whether the parcel sits over a protected aquifer zone, and the plans and limits that follow.

Sensitive land

Critical environmental features, protected habitat, slopes, buffers and setbacks from water.

Impervious cover

How much of the site can be roof and paving, and what changes the limit.

Watershed and floodplain

The watershed rules, the mapped floodplain and what each means for the layout.

Utilities today

Water, wastewater or septic, power and fire flow: who serves the parcel and what capacity exists.

What is coming

Planned roads, utility extensions, capital plans and new development nearby.

Deed restrictions and title

Recorded restrictions, easements and covenants from the deed records and title plants.

Fire and building codes

The adopted fire and building codes, with the local amendments that change them.

New laws

State and local changes that affect the parcel, and the date each takes effect.

Vested rights

Earlier permits or plats that may hold older rules in place. In Texas, often called grandfathering.

Every finding

Four answers. Nothing rounded up to a pass.

Clear

Checked against the source. Nothing stands in the way.

Requirement

Something you must do or provide, and who decides it.

Unknown

Not confirmed yet. Never treated as a pass. We say how to find out.

Conflict

Sources disagree, or the plan conflicts with a rule. These rank first.

Vested rights

The rules you may already have.

In Texas, a project can often be held to the rules in effect when its first permit application was filed. An old plat or permit can matter more than the current code.

VALITER looks for those records and flags where vested rights may apply, and where they do not. An attorney or the city confirms the answer.

Every finding shows
  • The rule and the exact source
  • The date we checked it
  • How sure we are
  • Who decides
  • What it depends on
  • Whether a licensed professional must confirm it

Keep reading

Waitlist open · Starting in Central Texas

Get on the list before your next site.

VALITER opens to a small group first, starting in Central Texas. Teams with a live site get in first.

No spam. Sites with a live deal move up the list. Tell us about yours.