What we check

Every constraint, in the order it matters.

VALITER runs the same library of checks on every site, in five stages. Each stage depends on the one before it, so the deal-killers surface first and nothing downstream is built on a guess.

Five stages

One route through the site

Where and whose, then legal footing, then the land, then service, then the shape. A check never runs ahead of the facts it depends on.

1

Where and whose

3 checks

2

Legal footing

3 checks

3

The land

5 checks

4

Service

4 checks

5

The shape

3 checks

Four answers

Every check returns one of four answers

No check is allowed to return a guess. Each answer carries its source and how sure we are.

Clear

The record answers the question and nothing stands in the way. You see the source.

Requirement

Something you will have to do, such as a plat, a permit, a study or a letter. It lands on your path, in order.

Conflict

Two sources disagree, or a rule and a fact cannot both be true. Conflicts rank above unknowns, because acting on the wrong one costs the most.

Unknown

We could not confirm it yet. Unknown is never treated as a pass. It comes with who to ask and how to find out.

Stage 1 · Where and whose

Where and whose

Before any rule can apply, we have to know exactly which land this is, whose rules govern it, and what is already recorded against it.

Parcel identity

The appraisal district record, legal description, acreage, owner of record and parcel shape, matched to the site you sent us.

Why it can stop a deal
The wrong parcel, an acreage mismatch or a legal description that reads as a partial lot changes every answer after it.
Where it comes from
County appraisal district and county GIS.
Who decides
A surveyor confirms the boundary. We flag what the record shows.

Jurisdiction

City limits, extraterritorial jurisdiction (ETJ), unincorporated county, special districts such as MUDs and groundwater districts, and the utility service areas the state maps.

Why it can stop a deal
Jurisdiction decides whose code applies and who approves each step. Map layers often lag the law. We treat an ETJ release as real only when a recorded document shows it.
Where it comes from
City and county GIS, state utility service area maps, recorded city resolutions.
Who decides
The city or county. Disputed boundaries go to your attorney.

Title pre-screen

Recorded plats, easements, deed restrictions and development agreements we can find in public records.

Why it can stop a deal
A restriction can bar the use you plan. An easement can sit exactly where the building needs to go. A development agreement can bind the next owner.
Where it comes from
County clerk records and recorded plats. A full title commitment comes later.
Who decides
Your title company and attorney.

Stage 2 · Legal footing

Legal footing

Next, whether the property is a legal lot you can build on, and which version of each rule it is entitled to.

Legal lot and plat status

Whether the land is a platted lot or unplatted acreage, and whether its current shape was ever approved.

Why it can stop a deal
In many Texas cities and ETJs, utilities and permits can be withheld until the lot is legally platted. Fixing it means a plat or replat, and that has its own triggers.
Where it comes from
Recorded plats, the appraisal district legal description, subdivision rules.
Who decides
The planning commission or the commissioners court, depending on jurisdiction.

Right-of-way and road reservations

Thoroughfare and transportation plans that can require land for future roads when the property is platted or replatted.

Why it can stop a deal
A required dedication or road reservation can take frontage and buildable area that the deal was priced on. It usually surfaces at platting, after the money is spent.
Where it comes from
Thoroughfare plans, transportation plans and subdivision rules.
Who decides
The city or county, at plat approval.

Vesting (grandfathering)

Texas law lets many projects keep the rules in effect when the first permit application was filed. We work out that date, and then which rules are exempt from it.

Why it can stop a deal
Vesting decides which version of each rule applies, and whether a pending code rewrite reaches your project. Some categories, such as utility connections, fees and certain flood rules, apply as of today regardless.
Where it comes from
Permit and application history, development agreements, state law.
Who decides
The city or county applies it. Your attorney confirms any vesting claim.

Stage 3 · The land

The land

Then the physical constraints. Several of these remove land before any percentage is applied, so the order inside this stage matters too.

Watershed and aquifer

The local watershed class and whether the site sits over the Edwards Aquifer recharge, contributing or transition zone.

Why it can stop a deal
These can cap impervious cover, add water quality requirements and require a state plan to be approved before construction starts.
Where it comes from
City watershed maps and state Edwards Aquifer program maps.
Who decides
The city or county, and the state environmental agency for Edwards rules.

Floodplain

Effective FEMA flood maps, preliminary maps that are coming, and any local floodplain drawn from newer rainfall data.

Why it can stop a deal
Floodplain can remove buildable area, require the building to sit higher, or limit how much you can spend improving an existing building before it must fully comply.
Where it comes from
FEMA flood hazard data and local floodplain maps.
Who decides
The local floodplain administrator.

Creek buffers

Water quality buffers and setbacks along creeks and drainage ways.

Why it can stop a deal
Buffers come out of the site before impervious cover is calculated, so a creek at the back of the lot can shrink the building more than it seems.
Where it comes from
City and county environmental maps and code.
Who decides
The city or county environmental reviewer.

Impervious cover

How much of the site can be paved or roofed, compared with what is already there, after buffers, floodplain and slope are taken out.

Why it can stop a deal
If the program needs more cover than the rules allow, the building shrinks or the plan changes. Every number we give here is a screening estimate.
Where it comes from
Watershed rules, aerial imagery of existing cover, elevation data for slope.
Who decides
The city or county. Your civil engineer confirms the numbers.

Environmental

Protected species habitat, karst and other sensitive features, wetlands and known environmental records near the site.

Why it can stop a deal
Habitat or a sensitive feature can mean surveys, mitigation or a changed footprint, each with its own clock.
Where it comes from
Federal and state environmental data and regional habitat plans.
Who decides
Federal and state agencies, through your environmental consultant.

Stage 4 · Service

Service

Can the site be reached, served and protected? These answers usually come from a utility or an agency, not a map.

Access

Frontage, who owns the road (state, county or city), driveway permit rules, driveway spacing and when a traffic study is required.

Why it can stop a deal
Too little spacing between driveways, or a state highway frontage with strict access rules, can move the entrance, add a study or cut the program.
Where it comes from
State and local access management rules and road ownership records.
Who decides
The state transportation department, county or city, depending on the road.

Water, wastewater and septic

The water and sewer provider for the site, distance to lines, available capacity and what a will-serve letter needs. Without sewer, whether an on-site septic system (OSSF) can work.

Why it can stop a deal
No capacity, a long line extension, or soils that cannot take a septic system can stop a site or change it.
Where it comes from
Utility service area maps, utility staff, county septic rules.
Who decides
The utility. The county or its authorized agent for septic.

Fire flow

The water flow the adopted fire code requires for your building size, construction type and sprinklers, compared with what the utility can deliver at pressure.

Why it can stop a deal
A short answer can mean a fire pump, on-site water storage or a redesign. Teams often find out after design is far along.
Where it comes from
The adopted fire code, a utility flow test.
Who decides
The fire marshal sets the requirement. The utility answers what is available.

Power

The electric provider, the distance to three-phase service, and what the provider says about equipment lead times.

Why it can stop a deal
Equipment waits can outlast the rest of the schedule. Line extensions can add cost no one priced.
Where it comes from
Electric service territory maps and the provider.
Who decides
The electric provider.

Stage 5 · The shape

The shape

Last, what can actually be built. These checks run at the end because they depend on every answer above.

Setbacks and building envelope

Setbacks, building lines on the plat, height limits, easements and landscape buffers, combined into the area where a building can actually go.

Why it can stop a deal
The envelope is where earlier answers add up. Road reservations, buffers and easements can leave a smaller pad than the deal assumed.
Where it comes from
Zoning or county rules, the recorded plat, the title pre-screen.
Who decides
The city or county.

Drainage

Whether detention or water quality controls are likely, and roughly where they would need to go.

Why it can stop a deal
Ponds take land. We flag the likely need. Sizing and design are engineering work.
Where it comes from
Drainage rules and criteria manuals.
Who decides
Your civil engineer designs it. The city or county approves it.

Full title review

The title commitment and its listed exceptions, read against the plan.

Why it can stop a deal
An exception found at closing can undo an assumption the plan relied on.
Where it comes from
Your title commitment.
Who decides
Your title company and attorney.

Professional gates

Some answers belong to a licensed professional. We mark each one in the report so nobody mistakes a screening result for a decision.

VALITER is decision support. We find the requirement, show the source, and tell you who has to confirm it. When a question needs a civil engineer, surveyor, title company or attorney, we say so and hand off what we found.

  • Drainage design and pond sizing. Your civil engineer.
  • Boundary and easement locations. Your surveyor.
  • Title exceptions and deed restrictions. Your title company and attorney.
  • Vesting claims and disputed jurisdiction. Your attorney.
  • Fire protection design. Your fire protection engineer, with the fire marshal.
  • Wetlands and habitat findings. Your environmental consultant.

Go deeper

Waitlist open · Starting in Central Texas

See what the checks find on your site.

Send us an address and what you want to build. We will show you what applies, what is unknown and your next move.

No spam. Sites with a live deal move up the list. Tell us about yours.